Customization: | Available |
---|---|
After-sales Service: | Engineer Door-to-Door After-Sales |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model
|
SL-787
|
SL-1575
|
SL-1880
|
SL-2880
|
SL-3200
|
SL-3900
|
Paper width (mm)
|
787
|
1575
|
1880
|
2880
|
3200
|
3900
|
Capacity (t/d)
|
0.8-1.5
|
4-5
|
5-8
|
8-10
|
8-10
|
10-15
|
Design speed (m/min)
|
80
|
210 |
210
|
210
|
210
|
220
|
Working speed (m/min)
|
40-60
|
100-180
|
150-180
|
160-190
|
160-190
|
160-200
|
Raw material
|
White waste paper, wood pulp
|
|||||
Paper weight (gsm)
|
12-40 g
|
|||||
>> RAW MATERIAL
No.
|
Name
|
Function
|
1
|
Forming wire
|
Extract the pulp fiber to felt
|
2
|
Alloy dryer cylinder
|
Dry the wet paper
|
3
|
Double-layer dryer hood
|
Cover dryer and collect the hot&moist air diffused by dryer
|
4
|
Axial-flow ventilator
|
Ventilate and pull out the hot&moist air in the exhaust hood
|
5
|
Roots vacuum pump
|
Provide vacuum force for suction box
|
6
|
Air compressor
|
Provide compressed air for pneumatic devices
|
7
|
Frequency conversion controlling cabinet
|
Control the speed of the machine
|
8
|
Vacuum suction box
|
Absorb water contained in the wet paper
|
9
|
High concentration hydrapulper
|
Break the waste paper into pulp
|
10
|
High frequency vibrating screen
|
Separate and remove large impurity in the pulp
|
11
|
Impeller
|
Stir pulp and keep pulp well-mixed with water
|
12
|
Pressure screen
|
Getting ride of impurities
|
13
|
Bleacher
|
Bleach and whiten pulp
|
14
|
Double disc refiner
|
Grind, refine and fibrillation
|
15
|
Low concentration sand remover
|
Remove sand and impurities
|
16
|
Pulp pump
|
Pulp transportation
|
17
|
Electrical operation cabinet
|
Control machine operation
|
18
|
Boiler
|
Provide steam for the drying section
|
>> PACKING & SHIPPING
Large machines are different from small machines. Their export packaging is stricter than small products. In order to avoid collisions during transportation, we wrap the outer layers of the machine with wood chips and wrap them in plastic film. In order to save space in the container, we package the sporadic parts together. Installed in a spare place in the container.
>> OUR SERVICE
>> FAQ
1.How long it will take to get the quotation?
--We usually give reply within 24 hours after getting your inquiry. If you are urgent to get the quotation, please feel free to call or tell us by email, then we can reply you as the first priority.
2. How long is your Warranty?
--All our products will have one year guarantee and we will continue to offer advice and spare parts after this period.
Within 1 year after receiving our machines, under right operation and non-artificial reasons, If there are any damaged parts or accessories, we will replace them by air-mail or express immediately free of charge.
After 1 year warranty, Spare parts and damaged parts will be charged at cost price. If there is something wrong with the machine, we are responsible to solve this problem soonest, and help customers to restore production as soon as possible.
3. Can you make paper mill design for us?
--Yes, we have professional team with rich experience of paper mill design by CAD software. You only need to tell us your open land dimension, we will make your future paper mill design.
4. What's the payment terms?
--30% initial payment when place your order, 70% balance payment before shipment.
5. How about your machine quality, we are worry about the quality.
--Shilong is a mature brand in china, 30 years manufacturing experience of different kinds of paper machines. We strictly manufacture and manage according to IOS9001:2008 System. And can match all the CE standard or more strict standard. Our paper machine is running well in more than 20 countries.
6. Could your engineer teach and train our worker and stay in our factory for long time?
--Yes, we will send rich practiced experience engineers to your country to install and test the machine and train your workers, but you should pay them salary.
7. Your machine price is high,is there any discount?
--Our machine price is reasonable, we are factory, so the price of machine is factory price, we are looking forward to cooperate with you, please do not hesitate to contact our sales for good price